
In the project kick off call it is vital to have a slide that lists the assumptions which are from the contract.
This allows the client to then confirm or correct the assumptions at the very start of the project instead of later on when the cost to fix the assumptions is too great or there is not enough time.
A project can only be a success if all parties are starting from the same point with the same objectives.